Backorder Update

Last UpdateProductStatus
Thu, 05-Sep-2024Janelle Crossover Halter Dress in Navy Blue

Backorder Notice: Delay in Janelle Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch 14-September-2024 4 Days
Delivery 18-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Dusty Rose

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Wisteria

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Navy Blue

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Stone

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Candy Pink

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Cobalt Blue

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Periwinkle Blue

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Ivory

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 05-Sep-2024Clea Strappy wide U-neck Padded Ruched Dress in Latte

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.


To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Tue, 27-Aug-2024Ellis Peplum Pencil Dress in Dusty Blue

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 27-August-2024
Fabric Production 03-Sept-2024 1 Week
Manufacturing 15-Oct-2024  6 Weeks
Quality Check 18-Oct-2024 3 Days
Shipping 28-Oct-2024 10 Days
In-House Quality Check 30-Oct-2024 2 Days
Packing and Dispatch 05-Nov-2024 4 Days
Delivery 07-Nov-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Thu, 22-Aug-2024Ellis Peplum Pencil Dress in Classic Black

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 22-August-2024
Fabric Production 29-August-2024 1 Week
Manufacturing 10-Oct-2024  6 Weeks
Quality Check 13-Oct-2024 3 Days
Shipping 23-Oct-2024 10 Days
In-House Quality Check 25-Oct-2024 2 Days
Packing and Dispatch 29-Oct-2024 4 Days
Delivery 07-Nov-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 31-Jul-2024Lexi Waistcoat & Lace Pleats Dress in Classic Black

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 31-July-2024
Fabric Production 7-Aug-2024 1 Week
Manufacturing 18-Sep-2024  6 Weeks
Quality Check 21-Sep-2024 3 Days
Shipping 1-Oct-2024 10 Days
In-House Quality Check 3-Oct-2024 2 Days
Packing and Dispatch 7-Oct-2024 4 Days
Delivery 9-Oct-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 31-Jul-2024Lexi Waistcoat & Lace Pleats Dress in Iconic White

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 31-July-2024
Fabric Production 7-Aug-2024 1 Week
Manufacturing 18-Sep-2024  6 Weeks
Quality Check 21-Sep-2024 3 Days
Shipping 1-Oct-2024 10 Days
In-House Quality Check 3-Oct-2024 2 Days
Packing and Dispatch 7-Oct-2024 4 Days
Delivery 9-Oct-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 31-Jul-2024Lexi Waistcoat & Lace Pleats Dress in *Premium* Cream Tweed

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 31-July-2024
Fabric Production 7-Aug-2024 1 Week
Manufacturing 18-Sep-2024  6 Weeks
Quality Check 21-Sep-2024 3 Days
Shipping 1-Oct-2024 10 Days
In-House Quality Check 3-Oct-2024 2 Days
Packing and Dispatch 7-Oct-2024 4 Days
Delivery 9-Oct-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 31-Jul-2024Lexi Waistcoat & Lace Pleats Dress in *Premium* Black Tweed

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 31-July-2024
Fabric Production 7-Aug-2024 1 Week
Manufacturing 18-Sep-2024  6 Weeks
Quality Check 21-Sep-2024 3 Days
Shipping 1-Oct-2024 10 Days
In-House Quality Check 3-Oct-2024 2 Days
Packing and Dispatch 7-Oct-2024 4 Days
Delivery 9-Oct-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Tue, 23-Jul-2024Teodora Corset Printed Maxi Dress in L'eden Floral

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 23-July-2024
Fabric Production 30-July-2024 1 Week
Manufacturing 10-Sep-2024  6 Weeks
Quality Check 13-Sep-2024 3 Days
Shipping 23-Sep-2024 10 Days
In-House Quality Check 25-Sep-2024 2 Days
Packing and Dispatch 29-Sep-2024 4 Days
Delivery 1-Oct-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Tue, 23-Jul-2024Teodora Corset Printed Maxi Dress in English Summer Garden

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 23-July-2024
Fabric Production 30-July-2024 1 Week
Manufacturing 10-Sep-2024  6 Weeks
Quality Check 13-Sep-2024 3 Days
Shipping 23-Sep-2024 10 Days
In-House Quality Check 25-Sep-2024 2 Days
Packing and Dispatch 29-Sep-2024 4 Days
Delivery 1-Oct-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 17-Jul-2024Averie Tulle Pleated Midi Skirt in Iconic White

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 4-July-2024
Fabric Production 11-July-2024 1 Week
Manufacturing 22-Aug-2024  6 Weeks
Quality Check 25-Aug-2024 3 Days
Shipping 4-Sep-2024 10 Days
In-House Quality Check 6-Sep-2024 2 Days
Packing and Dispatch 10-Sep-2024 4 Days
Delivery 12-Sep-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 17-Jul-2024Averie Tulle Pleated Midi Skirt in Classic Black

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 4-July-2024
Fabric Production 11-July-2024 1 Week
Manufacturing 22-Aug-2024  6 Weeks
Quality Check 25-Aug-2024 3 Days
Shipping 4-Sep-2024 10 Days
In-House Quality Check 6-Sep-2024 2 Days
Packing and Dispatch 10-Sep-2024 4 Days
Delivery 12-Sep-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 17-Jul-2024Avelle Tailored Blazer in Classic Black

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 4-July-2024
Fabric Production 11-July-2024 1 Week
Manufacturing 22-Aug-2024  6 Weeks
Quality Check 25-Aug-2024 3 Days
Shipping 4-Sep-2024 10 Days
In-House Quality Check 6-Sep-2024 2 Days
Packing and Dispatch 10-Sep-2024 4 Days
Delivery 12-Sep-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 17-Jul-2024Avelle Tailored Blazer in Iconic White

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 4-July-2024
Fabric Production 11-July-2024 1 Week
Manufacturing 22-Aug-2024  6 Weeks
Quality Check 25-Aug-2024 3 Days
Shipping 4-Sep-2024 10 Days
In-House Quality Check 6-Sep-2024 2 Days
Packing and Dispatch 10-Sep-2024 4 Days
Delivery 12-Sep-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.

Wed, 26-Jun-2024Clea Strappy wide U-neck Padded Ruched Dress in Blush Pink

Backorder Notice: Delay in Clea Dress Delivery

Update: Unfortunately, we've encountered unforeseen delays during the fabric production process, which will affect the delivery timeline. We understand this may be frustrating, and we sincerely apologise for any inconvenience caused.

To better understand why our backorder process spans 10 weeks, please refer to the timeline table below. As each piece is meticulously crafted from scratch, we've allotted ample time to preserve excellence in Chello's standard and quality. Your patience is truly appreciated. In any cases if the backorder is able to arrive earlier, our team will do our best to dispatch your order as soon as possible.

Backorder Open 26-June-2024
Fabric Production 3-July-2024 1 Week
Manufacturing 14-Aug-2024  6 Weeks
Quality Check 17-Aug-2024 3 Days
Shipping 27-Aug-2024 10 Days
In-House Quality Check 29-August-2024 2 Days
Packing and Dispatch (25-27)-September-2024 4 Days
Delivery 29-September-2024 2 Days

We will do our best to have the item delivered to you by the above date. Kindly allow some flexibility in case of any unforeseen circumstances that could cause a delay. We will keep you informed throughout the process. Refer here for the backorder status update.